True/False Indicate whether the
statement is true or false.
|
|
1.
|
ACCA Manual J is used for load calculation
|
|
2.
|
A technician should develop a sequence for installation
|
|
3.
|
The success of any installation lies in planning
|
|
4.
|
Part of the success in installation requires the technician checking the
manufacturer installation guidelines
|
|
5.
|
Before installing refrigerant lines make sure that the indoor metering device is
the correct one for the application
|
|
6.
|
The maximum pipe length should not exceed 175 feet
|
|
7.
|
A standing pressure check is normally use for refrigerant leaks
|
|
8.
|
After the system is tested for leaks a vacuum @ 500 microns should be
done
|
|
9.
|
An HVACR Contractor has to be sure that the overcurrent protectio device is the
correct one for the outdoor unit
|
|
10.
|
There should be around 400 CFM per ton of airflow for the evaporator
|